Oil
39 MJ/kg
calorific value
Feedstock for petrochemicals, where it becomes new plastics again. Or fuel.
Heat without oxygen breaks it back down into oil, gas and carbon. No flame, inside a sealed reactor. Tyres and mixed plastics included.
Four steps, no flame. Click through the steps.
Waste is shredded into even pieces and cleared of metal, glass and stone. The more uniform the input, the cleaner the oil.
In the reactor, the material is heated to 400–600 °C with no air. It doesn’t burn; it breaks into shorter molecules that evaporate.
The vapour cools. Heavier parts condense into oil, lighter ones stay gas. Carbon leaves through the bottom.
A CHP unit burns the gas to power and heat the plant. The surplus is yours; oil and carbon are for sale.
Three routes for waste that can’t be recycled. Only one turns it into something you can sell.
| Aspect | Landfill | Incinerator | Pyrolysis |
|---|---|---|---|
| What happens | It lies in the ground. | It burns. | It breaks down without oxygen. |
| What’s left | All of the waste. | Ash and flue gas. | Oil, gas and carbon. |
| What you get | A rising fee, a ban from 2030. | A gate fee to pay. | Raw materials and your own energy. |
Almost anything with carbon and hydrogen. But composition matters.
PE, PP and PS (films, packaging, cups), tyres and rubber. They give the most oil.
PET and PVC. Oxygen and chlorine lower oil quality, so only in small shares.
Metal, glass and stone don’t break down. Wet material is best dried first.
Codes per the European List of Waste. We assess other types from an analysis of your sample.
Mostly oil from plastic, a broader mix from tyres. None of it ends up as waste.
39 MJ/kg
calorific value
Feedstock for petrochemicals, where it becomes new plastics again. Or fuel.
31.8 MJ/m³
calorific value
Similar to natural gas. It powers the plant; the surplus energy is yours.
over 92%
carbon content
For filters, concrete, industry and soil. Tyres yield carbon black.
about 70 kg
per tonne of tyres
Tyre cord comes out clean and goes straight to steelworks.
A line for large streams, a module for smaller volumes right at the source.
For waste collectors, recyclers, industrial parks and towns.
For factories, farms, sorting lines and smaller towns.
Enter the type and volume of your waste. You’ll see the result instantly.
The calculation uses the average balance of an industrial line: gas at 31.8 MJ/m³, oil at 39 MJ/kg, CHP electrical efficiency of 40% and the line’s own consumption of 380 kW. Actual values depend on the composition of your material and are confirmed by a feasibility study.
Nothing burns in the reactor. The only emission source is the CHP unit on the plant’s own gas, with the same limits as a gas engine.
Permitting is usually the longest part of a project. That’s why we run it ourselves, from day one.
No. Incineration is oxidation: material burns in air and its energy leaves in hot flue gas. Pyrolysis happens without oxygen. Heat breaks the material into smaller molecules, which we capture as oil, gas and carbon and trade onwards.
An industrial line needs roughly 380 kW. A CHP unit running on its own pyrolysis gas covers that, so the line is energy self-sufficient and needs no permanent external power connection. A compact module draws 10–20 kW on average.
The process is tuned to a specific material. The compact module has its own programme for each input type; the industrial line works best with a steady mix. The feasibility study starts from an analysis of your samples, and we propose how to even out the input.
You can sell them yourself. Or use our offtake: we buy the products at a price fixed in the contract and arrange collection.
An industrial line sits in modular containers measuring 24.4 × 4.9 × 5.4 m and takes up about 120 m². Hardstanding with utility connections is enough. Compact modules are smaller. We assess your site at the first analysis.
Mainly on what you pay for disposal today, what you get for the oil and carbon, and how much energy you use yourself. For compact modules the manufacturer expects payback within 3 years. We calculate it for your site in the feasibility study. If you’d rather not invest at all, choose the pay-per-tonne model.
Type, volume and where it arises. We’ll send a preliminary balance.