Plastic is just oil in another shape.

Heat without oxygen breaks it back down into oil, gas and carbon. No flame, inside a sealed reactor. Tyres and mixed plastics included.

What happens inside the reactor

Four steps, no flame. Click through the steps.

Pyrolysis plant schematic: shredding, reactor, condensation and CHP Shredding uniform fraction Reactor 400–600 °C no oxygen carbon Condenser vapour to oil oil CHP unit power and heat energy for the plant itself

Shredding to a uniform fraction

Waste is shredded into even pieces and cleared of metal, glass and stone. The more uniform the input, the cleaner the oil.

Tyre fraction
55 × 55 mm
Industrial line input
700–1,000 kg/h

Bury it, burn it, or break it down?

Three routes for waste that can’t be recycled. Only one turns it into something you can sell.

AspectLandfillIncineratorPyrolysis
What happensIt lies in the ground.It burns.It breaks down without oxygen.
What’s leftAll of the waste.Ash and flue gas.Oil, gas and carbon.
What you getA rising fee, a ban from 2030.A gate fee to pay.Raw materials and your own energy.

What belongs in the reactor

Almost anything with carbon and hydrogen. But composition matters.

  • Best

    PE, PP and PS (films, packaging, cups), tyres and rubber. They give the most oil.

  • In smaller shares

    PET and PVC. Oxygen and chlorine lower oil quality, so only in small shares.

  • Doesn’t belong

    Metal, glass and stone don’t break down. Wet material is best dried first.

Show the waste catalogue codes
  • 16 01 03Tyresline and module
  • 20 01 39Plasticsline and module
  • 07 02 13Plastic waste from productionline and module
  • 20 01 01Paper and cardboardmodule
  • 20 01 11Textilesmodule
  • 04 02 21Unprocessed textile fibresmodule
  • 03 01 05Sawdust, shavings, cuttings and woodmodule
  • 02 02 02Animal-tissue wastemodule

Codes per the European List of Waste. We assess other types from an analysis of your sample.

What comes out of the reactor

Mostly oil from plastic, a broader mix from tyres. None of it ends up as waste.

Plasticsaverage balance
Tyresaverage balance

Mass shares of input on the industrial line. For plastics, carbon makes up 3%.

Oil

39 MJ/kg

calorific value

Feedstock for petrochemicals, where it becomes new plastics again. Or fuel.

Gas

31.8 MJ/m³

calorific value

Similar to natural gas. It powers the plant; the surplus energy is yours.

Carbon

over 92%

carbon content

For filters, concrete, industry and soil. Tyres yield carbon black.

Steel

about 70 kg

per tonne of tyres

Tyre cord comes out clean and goes straight to steelworks.

Two sizes of technology

A line for large streams, a module for smaller volumes right at the source.

  1. 24,4 m 5,4 m

    Industrial line

    For waste collectors, recyclers, industrial parks and towns.

    Daily capacity
    up to 17 t
    Annual capacity
    5,600–8,000 t
    Dimensions (L × W × H)
    24.4 × 4.9 × 5.4 m
    Footprint
    approx. 120 m²
    Own consumption
    380 kW from its own gas
    Inputs
    plastics, tyres
  2. 3 independent reactors PLC CHP

    Compact module

    For factories, farms, sorting lines and smaller towns.

    Capacity
    1–3 t a day
    Operation
    up to 350 days a year
    Reactors
    3 independent, 8 or 12 h cycle
    Heating
    electric panels, no burners
    Average power draw
    10–20 kW
    Target payback
    within 3 years

What’s in your waste

Enter the type and volume of your waste. You’ll see the result instantly.

Material
t a year
€/t

Enter the price from your contract. The default is only an example.

Raw materials per year

Oilfeedstock for chemistry, or fuel0t
Gas0 m³, powers the plant0t
Carbonfor industry and construction0t

Energy per year

Energy in the gas0MWh
Surplus electricityafter covering the plant’s own use0MWh
Heat from the CHP unit0MWh
Energy stored in the oilif you sell it rather than burn it0MWh

Costs

Disposal costs you no longer pay0€ a year
Recommended technology Industrial line

The calculation uses the average balance of an industrial line: gas at 31.8 MJ/m³, oil at 39 MJ/kg, CHP electrical efficiency of 40% and the line’s own consumption of 380 kW. Actual values depend on the composition of your material and are confirmed by a feasibility study.

A closed process. Open numbers.

Nothing burns in the reactor. The only emission source is the CHP unit on the plant’s own gas, with the same limits as a gas engine.

Permitting is usually the longest part of a project. That’s why we run it ourselves, from day one.

EIA screening
Czech Act No. 100/2001 Coll.
Air dispersion study
air quality, Act No. 201/2012 Coll.
Operating permit
Act No. 541/2020 Coll.
Building permit
the construction part
REACH registration
oil and carbon as products, not waste
Grid connection
to sell surplus power to the grid

Questions we get asked

Is pyrolysis the same as incineration?

No. Incineration is oxidation: material burns in air and its energy leaves in hot flue gas. Pyrolysis happens without oxygen. Heat breaks the material into smaller molecules, which we capture as oil, gas and carbon and trade onwards.

How much energy does the plant use?

An industrial line needs roughly 380 kW. A CHP unit running on its own pyrolysis gas covers that, so the line is energy self-sufficient and needs no permanent external power connection. A compact module draws 10–20 kW on average.

What if my waste composition changes?

The process is tuned to a specific material. The compact module has its own programme for each input type; the industrial line works best with a steady mix. The feasibility study starts from an analysis of your samples, and we propose how to even out the input.

Who will buy the oil and carbon?

You can sell them yourself. Or use our offtake: we buy the products at a price fixed in the contract and arrange collection.

How much space does a line need?

An industrial line sits in modular containers measuring 24.4 × 4.9 × 5.4 m and takes up about 120 m². Hardstanding with utility connections is enough. Compact modules are smaller. We assess your site at the first analysis.

How quickly does the investment pay back?

Mainly on what you pay for disposal today, what you get for the oil and carbon, and how much energy you use yourself. For compact modules the manufacturer expects payback within 3 years. We calculate it for your site in the feasibility study. If you’d rather not invest at all, choose the pay-per-tonne model.

Send us a sample. We’ll work out what’s in it.

Type, volume and where it arises. We’ll send a preliminary balance.